Application for reset permission. Permission to discharge pollutants into the environment in the framework of the current draft standards of permissible discharges

Application for reset permission. Permission to discharge pollutants into the environment in the framework of the current draft standards of permissible discharges

General

Reset permission - a document where the regulations of the discharge of pollutants and microorganisms are defined for each release. wastewater The existing enterprise, based on the conditions for the inadmissibility of exceeding the maximum permissible concentrations of harmful substances (MPC) in the control rate or on the site of the water object, taking into account its target use.

Recycling or unloading objects, materials or solid waste subjected to mechanical grinding, or water containing materials such as materials, as well as for transmitting contaminated or polluting liquids or input in them gases. It is also forbidden to enter solids or fluid into such a place that they can be through the natural phenomenon to be in the same waters.

To the discharge of industrial wastewater

To the discharge of household wastewater. . These versions may not contain. These issues are allowed under the following conditions.

Wastewater treatment fee in sewer

Waste waters discharged into the sewage system are partly disinfected on one of the two sewage treatment stations in the Brussels-Capital region.

Regulatory framework for reset permission

  • the federal law N 7-FZ "On Environmental Protection".
  • Water Code of the Russian Federation. Codex RF of 03.06.2006 No. 74-FZ.
  • GOST 17.1.1.01-77. Protection of Nature. Hydrosphere. Use and protect water. Basic terms and definitions.
  • GOST 17.1.1.02-77. Protection of Nature. Hydrosphere. Classification water objects.
  • GOST 17.1.1.03-78. Protection of Nature. Hydrosphere. Classification of water use.
  • GG 2.1.5.1315-03 "MPC of chemicals in water of water and drinking and cultural and consumer water use facilities."
  • GG 2.1.5.1316-03 "ADU of chemicals in water of water and drinking and cultural and consumer water use."
  • Order of Russia's Russians from 18.014.2010. № 20 "On approval of the quality of water quality of water fishery objects".
  • Federal Law of August 8, 2001 N 134-FZ "On the protection of the rights of legal entities and individual entrepreneurs in conducting state control (supervision)."
  • Decree of Government Russian Federation of July 23, 2007 N 469 "On the procedure for approving the standards of admissible discharges of substances and microorganisms in water objects For water users. "
  • Order of the Ministry natural resources Of the Russian Federation of December 17, 2007 N 333 "On approval of the methodology for developing standards for permissible discharges of substances and microorganisms into water bodies for water users" (registered in the Ministry of Justice of Russia 21.02.2008, N 11198).
  • Surface Waters Protection Rules (Typical Provisions). Applied. State Committee of the USSR 21.02.1991

According to the environmental legislation of the Russian Federation, all legal entities having stationary sources of pollutant discharges into water bodies are obliged to ensure the inventory of the discharges of harmful pollutants into water bodies and the development of the VAT project, after the coordination and approval of which is issued permission to reset.

Theoretically, everyone should pay a fee proportional to the amount of dischargeable substances of each type. Therefore, everyone should take into account their water discharges and analyze them. It is unreal, even if this opportunity is provided to each company.

After reviewing your file, Brussels Wednesday will inform you: either all your wastewater is considered internal because your company is less than seven people, and there is no special risk of water pollution, and in this case you will no longer have to pay, or you have to compensate you Duties, if water taken from wastewater is at least partially industrial and, based on theoretical calculation, the pollutant load is less than 20 million units. The fee for a fixed rate will be calculated on the basis of your business sector and the volume of these fees. In this case, analyzes will be requested, and the additional fee or partial reimbursement will depend on the actual loading of pollutants present in your wastewater. This chemical compound is extracted from bauxite and is used to produce aluminum.

The discharge permit receives the water user in the Rosprirodnadzor after approval of the VAT project. When developing a VAT project, a third-party permission to the discharge, as well as the extension of the discharge permit deals with the executor to transfer the customer enterprise.

List of documents required for obtaining (renewal)

The process of excretion of alumina from bauxite leads to the formation of two types of waste: technological wastewater and bauxite residues. These waste, called "Red Dirt", are loaded with polluting substances, harmful to human health and the environment.

The accident led to the leak of about 15 m3 of the material. For getting for more information About the history of red slope at the plant in Gardane. Discover a public visit to the sewer: a living museum on the history of an extensive underground network, born in the 19th century.

Under cobblestone, Paris water - Discover the secrets of the Paris Metro

Thus, a double water distribution network and a sewage network with a length of 600 km.

Real city under the city

At every corner of the gallery there is a street sign corresponding to the Paris address. Human scale, it is now available on foot and accommodates numerous pipes for water supply, air conditioning or telecommunication cables. Cleaning sewage is based only on hydraulic energy: water held by an artificial barrier creates a strong current during the opening of the valve, which pursues the agglomerated deposit downstream.

  1. Agreed and approved VAT project;
  2. To extend the permission, you must submit:
    - KHA protocols for the past period.
    - Report on the implementation of water protection measures over the past year.
    - Plan of water protection measures next year.

The duration of the permission for reset is determined by the Rosprirodnadzor not more than 5 years (for the period of the VAT project). Based on the standard for permissible discharges, the water user is obliged to annually extend permission to reset pollutants. For these purposes, reporting documentation is provided on the immutability of technological processes conducted by measurements, etc.

Management of Parisian sewage

142 km of emissaries and collectors. 671 km of auxiliary work. 35 km of water supply. It has three main goals.

Optimization of water flow conditions

Wastewater is transferred, some of which are deposited into the sewer. With normal operation, the lack of electricity and retention of premises do not allow the use of engines for security reasons.

Washing tank, a permanent cleansing device, usually located in the head of each elementary sewer collector, is automatically filled before suddenly release the retained water. The thread created thus cleans some of the sewage. Water used - non-rigid water.

Responsibility for the lack of permission to reset

For the implementation of the discharges of pollutants without a special permit for reset, administrative responsibility is provided for administrative responsibility in accordance with Article 8.13 "Violation of the rules for the protection of water bodies" of the Code of Administrative Offenses of December 30, 2001 No. 195-FZ, which is subject to both individuals and legal entities.

Collectors are cured with boats or valves in accordance with their dimensions. To control and clean these structures, the sewage network commands operate through the network, and using a computerized sewage crew system report on the physical state of structures on portable data entry terminals every day. Checked twice a year. Information is transmitted by telephone lines to the database where they are processed and archived.

Cracks can create infiltration that pollute the soil, destabilize the soil and cause possible collas. A large-scale rehabilitation program has been implemented. Nine sewage pumping installations, built together with sewage, also received a complete upgrade of their equipment.

Both household and industrial wastewater may be dangerous to human health and the environment, therefore their disposal is governed by laws and regulatory acts. This article will be told about who can be issued permission to discharge wastewater and what is required for this.

In order to remove wastewater into sewage networks of settlements, natural reservoirs or groundwater, industrial enterprises must be obtained in the relevant authorities permission to reset, as well as conclude an agreement on the admission and discharge of wastewater with water voltage.

Two networks for drinking and non-tech water, the latter is mainly designed to clean the streets and sewers, as well as for watering parks and gardens of public or private telecommunication cables, ice water distribution network for air conditioning buildings. The sewage setting allows you to install and maintain pipes or cables without opening the excavation on public transport. For security reasons, only gas pipelines are not allowed, electrical cables and heating pipes.

Protection of the city from flooding

The tenants of the Technical Gallery every year pay the fee into the budget of the city of Paris, so that the financial burden of network maintenance is distributed evenly between the waterproof and residents of the public domain. In the case of thunderstorms or strong precipitation, the network bandwidth can sometimes be insufficient. To avoid floods on the roadway or in private houses, there are work on the evacuation of excess water directly in Sene.

Such permission is issued only on the basis of an act issued by the State Commission on the acceptance of the facility, so it can only be obtained upon completion of the construction or reconstruction of the enterprise.

Resetting stocks of enterprises in cities or towns is permitted only if the enterprise has a sewage treatment plant in which the wastewater should be cleaned to compliance with the established standards.

Nevertheless, in the case of a heavy rain, a "safety valve" was installed: overflow storms. These are galleries that connect the sewage with the hay, allowing you to drain the drain directly into the valve system allows you to discard only what is strictly necessary, because these raw water discharges pollute environment.

Thanks to this management, the goal of protecting the environment - by limiting the discharge of the stormwater in Seine - it became possible, avoiding flooding of the sidewalks of the capital. With simple telephone call They move and quickly diagnose or solve problems associated with flooding, clogging or subjects that have fallen into the sewer. Police provides a visit to the safety around public buildings.

Basics for issuing discharge permits

For newly constructed enterprises, the base for obtaining a wastewater is obtained into the sewer system is coordination with water voltage, and for the renovated existing enterprises, the basis of the water economy is served.

Sanction for wastewater discharge into natural reservoirs (rivers, seas, lakes, etc.) is issued on the basis of notification from the organs of natural resources, which includes the Environmental Management Office.

In underground galleries, the water cycle and the work of Paris collectors are caused. It is carried out for about 1 hour through galleries so that visitors can find part of the sewage network. In addition, many models or real machines used yesterday and today are displayed in all rooms and corridors of the visiting scheme.

Thus, it is possible to detect the "carriage valve" to clean the sewer collectors, the "gateway", which works in large collectors or even in the old pump of water lifting. Visitors can take pictures or shoot. The program of the route scheduled for children, and all useful information, can be found on the agenda!

Important: The form, in accordance with which the industry's enterprise is being developed for a water management passport, is provided by a sewage and plumbing organization. This form also indicates the resetting norms and their composition.

Documents required to obtain permission for discharge

To obtain in relevant organizations, permission to eliminate industrial uncleans, the company must submit the following documentation:

  • From Saturday, on Wednesday from 11 to 17 from October 1 to April 30.
  • From Saturday, on Wednesday from 11 to 18 from May 1 to September 30.
Continuing viewing on this site, you accept their use. Visiting sewage is carried out in the premises arranged for the public and air. However, taking into account the proximity of the unhealthy environment, it is advisable to appeal to the doctor, contacting a person interested in visiting and suffering from pulmonary failure.

Sanitation is the responsibility of each municipality. In Paris, it is managed by the Paris Sanitation Section, the technical department of the city integrated into the Department of Water Management and Waste. Indicators for sewage network. In the department of Sanitation of Paris, 473 agents work, of which about 320 sewer workers, managers and wastewater controllers regularly interfere with the sewage network. Ensure the proper functioning of the wastewater collection network and collecting rainwater in order to preserve the Paris medium. In order to balance the costs of sanitation, the municipality annually records the "collection" rate of the part of the gathering for a sane paid by the water user.

  • Acts confirming the work carried out, drainage wells, isolation, foundation, soil seal, etc.;
  • Technical passports for equipment used in the work;
  • The statement of testing the strength of concrete in the case of its use;
  • Acts confirming positive test results for strength and waterproof;
  • Drawing of the system of the system used to remove the wastewater;
  • Certificate confirming the performance of anti-corrosion coating of welds and compounds, as well as their diagnosis;
  • Information on the deviations from the initial construction project;
  • Act on the operation of the pipeline system;
  • The act of receiving the internal sewage network of the enterprise;
  • Drawing of the wiring of the sewer network and plumbing equipment;
  • Help for assigning the address and number in the registry to this object.

Restrictions imposed on the composition of wastewater

Production wastewater is allowed to dismiss in the sewage system, a number of restrictions associated with their composition are superimposed, such as:

It is calculated based on water consumption. The coastal owner who wants to connect to the sewer network through a new branch or an existing re-used branch must send a request for a specific branch to the Paris Section of Sanitation.

The application must be represented at least 9 months before the desired date of commissioning of the connection. The project is drawn up by the competent territorial division on the basis of the information provided by the applicant. Sewer permission and wastewater discharge permit is issued in the form of an agreement with the rights and obligations of the user and services. Part of the industry under the public domain of a commonly conducted by the Paris Section of Sanitation at the expense of the owner and integrated on its completion to the state sewer system.

  • It is forbidden to allow industrial waste consumption exceeding the established limit;
  • The content of floating, dissolved and suspended particles in water should not exceed the corresponding norms;
  • Wastewater should not cause damage and destruction of materials from which the pipeline or the elements of sewage treatment facilities are made;
  • The composition of wastewater should not include particles that can lead to clogging of the sewage pipeline or the appearance of deposits on the walls of the sewage pipes;
  • Industrial estates should not be in its composition of explosive impurities, as well as bacterial pollutants;
  • The required temperature of the effluent is no more than 40 degrees, but the pH value is from 6.5 to 9.0;
  • In industrial wastewater should not contain gases and acids, the evaporation of which are harmful to human health, as well as elements that create interference for biological sewage cleaning.

Terms of use of common stock

Obtaining a sanction on the use of common runoff for the withdrawal of industrial wastewater, has its own specific features:

Access to sewer networks is strictly regulated and must be resolved by the Paris Sanitation Section. For more information or for a specific connection request. The applicant must contact the authority water resourcesresponsible for the distribution of water in Paris, and request him before sending or presenting it to the corresponding district.

Service of individual connections

If no one responds, you are invited to leave a message on an answering machine with your contact information. The specific branch consists of an affordable gallery available from the total parts of the basement of the building undertaken for private use. Part of the branch under public domain is supported by the Paris Sanitation Section. However, in the case of compounds closed to sewage and available only from the embankment building, the owner or his representative is obliged to follow the state of work by visiting at least once a year and immediately report any anomalies into the Sanitation section.

  1. To use the overall stock, industrial enterprise Must get permission and make an agreement in the relevant enterprise serving water supply and sewer.
  2. In the case of a limited period of action to continue using the runoff after its expiration, you should either extend the term of the contract, or to compile a new treaty.
  3. If, during the term of this contract, changes occurred in the water household enterprise, it undertakes to notify the relevant management organizations about them during the ten-day period.
  4. The basis for re-issuing permits for the use of general runoff is the development of a new sewage system project in the enterprise.
  5. Upon receipt by the enterprise the right to use the subsoil and special use of technical waters, the permission is also valid for the discharge of the sewage received from the urban water supply network.

Bans included in the permission for discharge

In any resolution of industrial wastewater, there is a whole list of prohibitions operating in accordance with the law "On Environmental Protection" and related to wastewater drain into natural natural reservoirs.

So, in natural reservoirs it is forbidden to reset the drains:

  • with the presence of impurities for which the methods of analysis and maximum permissible concentration are not regulated;
  • having the possibility of re-use, for example, in reverse water supply;
  • industrial drains for which the cleaning procedure has not been carried out;
  • having in their composition sources of infectious and viral infections that create the risk of exceeding the epidemiological threshold;
  • are the final products of the neutralization of technological and household waste;
  • including oil-containing substances and construction waste.

Organization of issuing permits for discharging

The issuance of permits for the excretion of industrial wastewater is organized in accordance with the instructions for issuing permits.

This instruction is developed by the relevant control bodies separately for each specific region.

The instructions are regulated as the terms of issuing or refusing to issue a discharge permit and the procedure for obtaining it.

In addition, this document provides for suspension and resumption of the previously obtained permit for the removal of industrial wastewater.

The basis for obtaining a permit for the inclusion of effluents in natural reservoirs is a statement that includes:

  • A list of all enterprise details, which includes its state registration;
  • Information about the place in which wastewater is discharged;
  • Average annual wastewater consumption indicators with approved limit standards.

In case of refusal to obtain permission to discharge wastewater, the decision makers are obliged to indicate the reason for the refusal.